Incinerator Equipment for Medical/Hospital/Infectious Waste
YDF double chambered incinerator for hospital and medical waste disposal. It is approved by CE ISO certification, smokeless and odorless. Especially suitable for incineration of hospital waste, infectious waste, sharps, sanitary napkins, medical waste, biological waste, plastic waste, public waste, industrial waste, etc.
| Model: | YDF |
| Capacity: | Daily waste processing capacity from 50kg to 5000kg |
| Type: | Manual, Automatic, Mobiled |
| Fuel: | Gas, Diesel |
| Application: | Solid waste, medical waste, industrial waste, general garbage,and other special waste |
Introduction
YDF medical waste incinerator is a commonly used equipment for the harmless treatment of medical and general waste. It can efficiently burn medical waste, hospital waste, infectious waste, domestic waste, and other solid materials like paper, plastics, and rubber waste. CE and ISO certified.
This incinerator uses double-chamber combustion and gasification pyrolysis technology. Also has an ash collection and flue gas purification system, so it is environmentally friendly, smokeless, and odorless.
We offer several types of incinerators:
· Manually loaded incinerators
· Semi-auto / Automatic feed incinerators
· Containerized incinerators
· Front-loading or top-loading incinerators
We also design customized incinerators based on the type and volume.
1. Pre-assemble the incinerator before delivery. It mainly includes: combustion chamber, secondary combustion chamber, flue gas purification system, and electrical control panel.
2. Keep flange connections. This makes on-site bolt assembly easy.
3. Cables and cable ties are clearly marked.
4. Perform commissioning before shipment. This ensures quick use after delivery.
5. Configure multi-stage flue gas treatment systems. They include cooling towers, venturi scrubbers, cyclone separators, bag filters, acid gas scrubbers or activated carbon filters, sedimentation tanks, and more.
We have more than 500 units operating in 40 countries – Backed by 10 years of experience in waste management.
High-Efficiency Combustion System
1. Advanced Pyrolysis + Gasification Incineration (850°C - 1200°C) ensures complete breakdown of tissues and pathogens.
2. ≥99.9% Pathogen Destruction – Meets international veterinary and bio-waste standards
3. Flue Gas Retention ≥2 Seconds – Ensures pathogen destruction
4. Doulbe Chambers: Primary combustion + reburning for complete burnout
5. Quick Heating: Reaches operating temperature within 20-30 minutes
Environmentally Compliant
1. Multi-Stage Purification: Secondary combustion chamber
2. Water-cooled cyclone/venturi scrubber
3. Dual spray towers + activated carbon filtration (optional)
4. CE-Compliant Output: Smokeless, odorless, and eco-friendly
Safe and Reliable Performance
1. Negative pressure combustion: Prevents smoke leakage.
2. Refractory Lining: High-grade insulation for heat retention
3. Stainless Steel Components: Corrosion-resistant and long-lasting
4. Ceramic Fiber Sealing: Asbestos-free and heat-resistant
■ Founded in 1956, a premium supplier assessed, certified, and inspected by SGS Group. Leading manufacturer in China.
■ Holds international boiler certifications: CE, ASME, DOSH, EAC, GOST, ISO
■ Over 17 years of export experience, gold-level supplier, ensuring payment and delivery.
■ Professional team integrating R&D, production, sales, and service.
■ 53,053㎡ Factory area, supporting video/VR factory audits or third-party inspections.
■ Engineers serving over 50 countries.
■ Products sold to over 130 countries/regions, covering Medical waste incinerator, hospital incinerator, solid waste incinerator, animal incinerator, pet incinerator, portable incinerator, containerised incinerator, venturi incinerator.
Quality Control
(1) Strength calculation report with applied materials information;
(2) 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3) 100% X-ray inspection( (Longitudinal, transversal safety inspection)): ensure the quality of entire boiler;
(4) Hydrostatic test: ensure the standard working pressure and safety;
(5) Third-party inspection report
Service
Comprehensive Boiler Solutions – From Planning to Lifetime Support
Pre-Sales Support:Expert Design Guidance: Help you select the optimal boiler model tailored to your industry needs.
Detailed Technical Documentation: Provide certificates, CAD drawings, consumption analysis, and boiler room planning.
Customized Solutions: Deliver complete system designs including installation material lists.
Competitive Pricing: Factory-direct rates with uncompromised quality.
After-Sales Assurance:Genuine Spare Parts: Original components with reliable supply.
Global Installation & Commissioning: Overseas engineer dispatch available.
On-Site Training: Ensure safe and efficient operation.
24/7 Online Support: Rapid response for any technical needs.
Warranty & Lifelong Care: One-year free maintenance and lifetime service support.
Parameter
| Model | YDF-20 | YDF-30 | YDF-50 | YDF-100 | YDF-150 | YDF-300 | YDF-500 |
|
Burning Capacity (5-6 batch/day) |
20-30kg/h | 20-30 kg/h | 30-50 kg/h | 50-100 kg/h | 100-150 kg/h | 200-300 kg/h | 300-500 kg/h |
| Incinerator Size(m) (L*H*B) | 1.6*1.3*1.75 | 1.45*0.9*2.55 | 1.8*1.15*3 | 1.8*1.4*3.4 | 2*1.4*3.5 | 2.2*1.4*3.8 | 3*2*4.8 |
| Imputing Size(mm) | 380*480 | 480*600 | 620*800 | 760*960 | 760*960 | 900*1100 | 1080*1280 |
| Chimney External Diameter(mm) | 280 | 280 | 280 | 300 | 300 | 400 | 460 |
| Draught Fan | 0.25kw | 0.37kw | 0.37kw | 0.5kw | 0.5kw | 1.1kw | 1.1kw |
| Voltage |
380V 220V |
380V 220V |
380V 220V |
380V 220V |
380V 220V |
380V 220V |
380V 220V |
| Weight(kg) | 1800 | 3000 | 5000 | 7000 | 8200 | 10000 | 16000 |
Relate Cases
Send Your Message
Please leave message with your contacts and the product you need. We will reply within 6 hours. Thanks.
Steam Boiler/Generator
Hot Water Boiler
Thermal Oil Boiler